Blogs Home » Browse Blogs » ABANDONMENT OF 132KV TRANSMISSION POWER STATION IN OKITIPUPA: GPBI, ONDO EX-MILITANTS WARN NDDC INTERIM ADMINISTRATOR, EFFIONG AKWA AND NDDC CONTRACTOR.

ABANDONMENT OF 132KV TRANSMISSION POWER STATION IN OKITIPUPA: GPBI, ONDO EX-MILITANTS WARN NDDC INTERIM ADMINISTRATOR, EFFIONG AKWA AND NDDC CONTRACTOR.

Ilaje  Akeredolu  NDDC  ONDO  SOUTH 

Photos

0 albums found